KOKUYO CAMLIN (SAMBA FACTORY, INDIA)

LOCATION Lane No. 9, Sidco, Phase - 1 I.G.C., Samba- 184 121
PRINCIPAL PRODUCTS Art supplies, poster colors, etc.
COMMENCEMENT OF OPERATIONS January 2008
SITE AREA 10,040m2
Inputs 2021 2022 2023
Energy (GJ) Volume of energy inputs 6,820 8,680 8,559
Fuel 579 752 588
Electricity 6,241 7,928 7,971
Water resources(m3 City/well water 6,977 10,259 11,709
Outputs 2021 2022 2023
Atmospheric emissions(t) CO2 492 600 675
SOx - - -
NOx - - -
Waste emissions(t) Total waste volume 103.4 116.2 173.1
Reuse/heat recovery 103.4 116.2 173.1
Final disposal 0 0 0
Emissions into bodies of water(m3 Volume of effluent 6,977 10,259 11,709
Emissions into public water areas - - -
Emissions into sewage systems 6,977 10,259 11,709
Restricted items emitted into bodies of water Hydrogen ion concentration (PH) 7.6 7.5 7.2
COD(mg/L) 48.0 104.0 64.0
BOD(mg/L) 8.0 23.0 11.0
SS(mg/L) 10.0 56.0 21.0